Project Name: Construction Investment Project of the Road from the Southern Economic Axis to Ta Day Dyke (Binh Minh Commune Economic Development Axis).
Location: Binh Minh Commune.
Investment Objective: To construct the road in a synchronized manner, contributing to overall socio-economic development.
Proposed Scale: L = 7 km; B = 50 m (Cross-section: Sidewalks + Carriageways + Median = 8 m × 2 + 15 m × 2 + 4 m); total length approximately 6,000 m.
Proposed Implementation Schedule: 2025 – 2030.
Preliminary Total Investment: 2,700 billion VND.
Investment Form: PPP.
Investor Selection Method: Open bidding.
Project Proposal Lead: Investor.