The wastewater collection infrastructure project for basins LB2 and LB3 in Long Bien District and the Phuc Dong and An Lac Wastewater Treatment Plants covers LB2 basin with an area of 1,464 ha and LB3 basin with an area of 1,456 ha located in Long Bien District
Project Name: Construction of the An Lac and Phuc Dong Wastewater Collection System and Treatment Plants
Sector: Water supply, wastewater collection and treatment, waste, urban green park, etc.
Geographical Location:
Wastewater collection system: Pipelines, manholes, separation wells installed underground under existing roads and sidewalks; lifting pumping stations located in Long Bien District
Phuc Dong Wastewater Treatment Plant with an area of 1.68 ha in Phuc Loi Ward (new administrative name)
Total Investment Capital: Estimated total project investment: 2,210,114,888,750 VND, including:
State capital, including: land clearance costs and construction of the collection system: 769,101,739,000 VND
Investor capital for the Wastewater Treatment Plant items: 1,441,013,149,750 VND
Project Scale:
Phuc Dong Wastewater Treatment Plant with capacity 31,500 m³/day; collection infrastructure with pipeline length 17.3 km, pipes D300–D1000mm, 04 pumping stations, manholes, and separation wells
An Lac Wastewater Treatment Plant with capacity 29,600 m³/day; collection infrastructure with pipeline length 16.7 km, pipes D300–D1000mm, 03 pumping stations, manholes, and separation wells
Investor Selection Method: Tender to select the investor to implement the investment project
Investment Form: Public-Private Partnership (PPP); Contract type: Build–Lease–Transfer (BLT)
Project Proponent: Department of Construction
Planned Implementation Schedule: 2024–2028
Implementation Status as of Q1/2025: Currently at the stage of preparing the pre-feasibility study report
The project provides a comprehensive wastewater solution for the Long Bien – Cau Bay area, improving water quality and reducing urban pollution.