An Lac – Phuc Dong Wastewater Collection System and Treatment Plant
The An Lac – Phuc Dong Wastewater Collection System and Treatment Plant project in Long Bien District has a total investment of more than 2,210 billion VND, covering two basins LB2 & LB3, with a total treatment capacity of 61,100 m³/day. Investment follows the PPP BLT model, and the project serves as a pillar in Hanoi’s strategy for water environment improvement and sustainable infrastructure development.

General Information

The wastewater collection infrastructure project for basins LB2 and LB3 in Long Bien District and the Phuc Dong and An Lac Wastewater Treatment Plants covers LB2 basin with an area of 1,464 ha and LB3 basin with an area of 1,456 ha located in Long Bien District
Project Name: Construction of the An Lac and Phuc Dong Wastewater Collection System and Treatment Plants
Sector: Water supply, wastewater collection and treatment, waste, urban green park, etc.
Geographical Location:
Wastewater collection system: Pipelines, manholes, separation wells installed underground under existing roads and sidewalks; lifting pumping stations located in Long Bien District
Phuc Dong Wastewater Treatment Plant with an area of 1.68 ha in Phuc Loi Ward (new administrative name)
Total Investment Capital: Estimated total project investment: 2,210,114,888,750 VND, including:
State capital, including: land clearance costs and construction of the collection system: 769,101,739,000 VND
Investor capital for the Wastewater Treatment Plant items: 1,441,013,149,750 VND
Project Scale:
Phuc Dong Wastewater Treatment Plant with capacity 31,500 m³/day; collection infrastructure with pipeline length 17.3 km, pipes D300–D1000mm, 04 pumping stations, manholes, and separation wells
An Lac Wastewater Treatment Plant with capacity 29,600 m³/day; collection infrastructure with pipeline length 16.7 km, pipes D300–D1000mm, 03 pumping stations, manholes, and separation wells
Investor Selection Method: Tender to select the investor to implement the investment project
Investment Form: Public-Private Partnership (PPP); Contract type: Build–Lease–Transfer (BLT)
Project Proponent: Department of Construction
Planned Implementation Schedule: 2024–2028
Implementation Status as of Q1/2025: Currently at the stage of preparing the pre-feasibility study report

Location

Key Advantages

1
1
1. Green Infrastructure for Hanoi’s Urban Growth

The project provides a comprehensive wastewater solution for the Long Bien – Cau Bay area, improving water quality and reducing urban pollution.

2
2
2. Advanced Technology, Efficient Operations

Equipped with modern, energy-efficient treatment technology that meets national discharge standards, ensuring sustainable and cost-effective operation.

3
3
3. Driving Sustainable Urban Development

The system supports the northern urban expansion of Hanoi, enhancing living quality and ecological balance for surrounding communities.

Virtual Map

Design & Layout

The design plan of the An Lac – Phuc Dong Wastewater Collection System and Treatment Plant is inspired by the idea “Green Parallel – Clean Flow”, reflecting the synchronization between technical infrastructure and urban landscape. The layout includes 2 treatment plants strategically located in Long Bien District: Phuc Dong (1.68 ha, capacity 31,500 m³/day) and An Lac (capacity 29,600 m³/day), connected with a 34 km network of underground pipelines (D300–D1000 mm), totaling 07 pumping stations, manholes, and separation wells. The site arrangement emphasizes optimizing collection flow, convenient operation, minimizing impacts on residential areas, while enhancing green spaces and harmonizing with the urban environment.
Design image 1

Legal Documents

Key Legal Documents Related to the An Lac and Phuc Dong Wastewater Collection and Treatment System Project:

Implementation Plan

Project Preparation

     

    Master plan (1/5,000 or larger)
    Detailed plan (1/500 or 1/2,000)
    Hanoi's project calling for investment

     

Investment Promotion

     

    Project Digitalization
    Investment Policy Approval
    Investor Selection

     

Implementation Monitoring

     

    Site Clearance
    Technical Plan
    Completion

     

In Progress
Completed

Subcribe to receive project information

AI ​​assistant is ready to help you!
Virtual Assistant
Checking status...
Hello! How can I help you with finding projects and investment information?
Send us your feedback