The Phu Do Wastewater Collection System and Treatment Plant project covers the S3 drainage basin with an area of 2,485 ha, located in Cau Giay District, Nam Tu Liem (former), and Bac Tu Liem (former).
Project Name: Construction of the Phu Do Wastewater Collection System and Treatment Plant
Sector: Water supply, wastewater collection and treatment, waste management, urban green space, etc.
Geographical Location:
Wastewater Treatment Plant: Capacity of 84,000 m³/day, occupying approximately 2.5 ha in Tu Liem Ward (according to the new administrative boundaries).
Collection Infrastructure: Covers most of Cau Giay District and part of former Nam Tu Liem District, with a total drainage basin area of 2,485 ha.
Total Investment Capital: Estimated VND 2,274 billion, including:
State capital: VND 913 billion
Investor capital: VND 1,361 billion
Project Scale:
Wastewater treatment plant with 84,000 m³/day capacity
Collection infrastructure: 18 km pipeline network, pipe diameters D300–D1500mm, 2 pumping stations, manholes, and separation wells
Investor Selection Method: Tender for project implementation
Investment Form: Public-Private Partnership (PPP); Contract type: Build-Lease-Transfer (BLT)
Project Proponent: Hanoi Department of Construction
Planned Implementation Schedule: 2024–2028
The collection system serves a 2,485 ha drainage basin, including the districts of Cau Giay, former Nam Tu Liem, and Bac Tu Liem, effectively addressing stormwater drainage and centralized wastewater treatment, while reducing the load on the existing combined sewer system